26.Allen, Kendra In Laws
Posted by Beyond the Box
Project Description
bathroom remodel
Scope
Bath DesignSoftware Required
Cabinet Lines Needed
CNC, Woodland - Patina
Posted by Beyond the Box
bathroom remodel
CNC, Woodland - Patina
Timeline: 1-2 weeks
Location: Billings, MT
Posted: October 20, 2026
© 2026 Orange Design Team. A division of Beyond the Box Inc.
Built in Billings, Montana ยท Serving all of North America